industrial roof
Villanova Mondovì (Cuneo) – Industrial roof
Year: 2013 Power: 99.5 kWp
Photovoltaic system on buildings
Realized in the municipality of Villanova Mondovì (CN). Photovoltaic system placed on the roof of an industrial building following the reclamation of the existing asbestos roof. Modules anchored to aluminium profiles placed flush to the east and west pitches and fixed to the roof structure. To facilitate maintenance, an anti-fall system was provided and suitable roof paths were equipped. A water distribution network has also been installed to allow the periodic washing of the photovoltaic modules
The installed power is 99.5kWp, obtained from high efficiency polycrystalline silicon modules. There are 4 three-phase inverters with multiple separate string inputs.
CONTACT US
Get more information
Get expert advice. Dimensione Ingenierie, through its technicians, can perform a preventive analysis to verify every aspect of implementing your renewable energy system.
Fill out the form below and we will get back to you as soon as possible.